Big Green: Singe-phase elevator?

Julie Gabrielli julie.gabrielli at verizon.net
Tue Jan 29 17:26:30 EST 2008


We are planning a small public building that will be served by a grid-tied
PV system. We have an elevator. The electrical engineer advises that we will
be required to produce 3-phase power w/ the PVs, since that is what we are
connecting to. This bumps us up into more PVs than we had intended, which is
over budget. 
 
We are exploring options. One is -- any single-phase elevators out there? I
found thru Googling, the Orion LU/LA. Does anyone have experience w/ this? 
 
Any other thoughts -- or elevators to recommend? We need accessibility plus
sized for a stretcher.
 
thanks,
 
Julie E. Gabrielli, NCARB, LEED 
 
Gabrielli Design Studio LLC
2002 Clipper Park Road, 4th floor
Baltimore, MD 21211
v   410.530.0389
f    410.243.2115
e    julie.gabrielli at verizon.net
 <http://www.gabriellidesignstudio.com/> www.gabriellidesignstudio.com
 
Let's live on the planet
as if we intend to stay.
 
 
 
 
 
 
 
-------------- next part --------------
An HTML attachment was scrubbed...
URL: http://lists.biggreen.org/pipermail/biggreen/attachments/20080129/4bb55e34/attachment.html


More information about the BigGreen mailing list